Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

Between Silos shearers Painted plaster peeling from the

SKU: 15311329179

4.8
USD100.00 USD144.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 26 - Aug 31

Live Spec

Between Silos shearers Painted plaster peeling from theSteel pipes and concrete forms rise between two of the Portland Cement Works Precinct's cylindrical silos, surfaces stripped back by decades of exposure. The silos are mid twentieth century construction, part of a 5. 9 hectare processing precinct that produced cement from 4 August 1902 until November 1991. Part of the Portland Cement Works series.

Store: www.ab-travaux.com · Domain: www.ab-travaux.com

Description

Painted plaster peeling from the walls of a corridor in the Kirkbride Complex

rusted laundry machines stand where workers once cleaned up after shifts in one of Australia's most significant cement plants

Part of the ATL Building series

Hydraulic Machinery at Yarraville

Rusting metal lockers line the walls of a worker changing room in the Ogurawa settlement

Between Silos shearers Painted plaster peeling from theSteel pipes and concrete forms rise between two of the Portland Cement Works Precinct's cylindrical silos, surfaces stripped back by decades of exposure. The silos are mid twentieth century construction, part of a 5. 9 hectare processing precinct that produced cement from 4 August 1902 until November 1991. Part of the Portland Cement Works series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products