Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

Main Floor To Mezzanine tunnel the scale of the operation

SKU: 32198613398

4.2
USD100.00 USD142.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 21 - Aug 26

Live Spec

Main Floor To Mezzanine tunnel the scale of the operationA rusted iron staircase climbs from the main floor of the abandoned ABBCO Bakery towards the mezzanine above, its paint peeling back in layers, forgotten machinery sitting dormant in the dust beyond the landing. The Leichhardt facility was, by 1973, described by the Baking Trade Employees' Union of NSW as the biggest independent bakery in Australia. Part of the ABBCO Bakery series.

Store: www.ab-travaux.com · Domain: www.ab-travaux.com

Description

the scale of the operation filling the frame

rated to 12

photographed in 2015 while the factory sat abandoned

A cast iron and timber bench sits in uncut grass at Queen Victoria Sanitorium

The internal circuits of the engine order telegraph aboard MV Cape Don

Main Floor To Mezzanine tunnel the scale of the operationA rusted iron staircase climbs from the main floor of the abandoned ABBCO Bakery towards the mezzanine above, its paint peeling back in layers, forgotten machinery sitting dormant in the dust beyond the landing. The Leichhardt facility was, by 1973, described by the Baking Trade Employees' Union of NSW as the biggest independent bakery in Australia. Part of the ABBCO Bakery series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products