Breakers and Compressor Room palms Weeds push through cracked concrete
Pay in 4 interest-free payments of $25.00 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 20 - Aug 25
Live Spec
Breakers and Compressor Room palms Weeds push through cracked concreteThe electrical distribution breaker panels at Elrington Colliery, with an adjacent lean to housing the air compressor that kept the mine's underground workings supplied with pressure. The workshop complex formed the operational heart of BHP's surface infrastructure at the colliery near Abernethy. Part of the Elrington Colliery series.
Store: www.ab-travaux.com · Domain: www.ab-travaux.com

























